TUV Rheinland logo white
UL logo white
KC mark white
IATF-logo-h80

IATF 16949 Factories | TUV, UL, KC Certified Products

Our facility · Suzhou, Jiangsu, China

Inside the factory
that builds your harness

Founded in 2015, with more than 100,000 cable assemblies shipped to overseas customers and an IATF 16949 quality system behind every batch. Most of our customers buy from us without ever visiting. This page is for them.

Plant

Suzhou, Jiangsu — HQ

Founded

2015

Quality system

IATF 16949 · ISO 9001

4,000 m²

Plant area

production, warehouse and lab

105

People

engineering, production and QC

10

Assembly lines

7 low-voltage + 3 high-voltage

IATF 16949

Automotive

quality system

Overview

Built for low-volume,
high-mix production

A 4,000 m² plant cannot compete with a 100,000 m² plant on a single part number run by the million. That is not what we sell.

What we sell is flexibility: harness lines that switch between battery, charging plug and ESS builds within a shift, a connector cell that handles 200 pieces as willingly as 20,000, and a lab that can qualify a new design without waiting three weeks for a third-party slot.

Most of our customers are EV, charging-station, ESS and power-module builders in the middle of a programme — where the drawing is still moving and the order is not yet a forecast. This is the plant built for that stage.

Microtech Plus production floor, wide view

Production floor — crimping area

Harness assembly line at Microtech Plus

Harness and connector assembly line

01 — Laboratory

In-house lab: we find the failure
before the customer does

Type tests for certification are carried out with TÜV Rheinland and UL. The routine tests — the ones that catch a drifting process — run here, on every batch, without an external booking or a three-week queue.

Electrical

Dielectric withstand, insulation resistance, contact resistance, low-level continuity.

Mechanical

Terminal pull-off force, insertion and withdrawal force, mating cycles, cable flex.

Environmental

Salt spray, thermal shock, damp heat, high and low temperature ageing, IP water and dust.

Dimensional

Crimp cross-section analysis, crimp height and width, first-article inspection reports.

HV withstand voltage test bench

Withstand voltage test

Crimp cross-section analysis station

Crimp cross-section analysis

Salt spray test chamber

Salt spray chamber

Thermal shock and temperature ageing chamber

Thermal shock & ageing

Flame resistance test chamber

Flame chamber

IP water and dust ingress test equipment

IP water & dust ingress

What we can hand you

Test report per batch

Electrical test data and pull-force results attached to the shipping documents, on request.

Crimp cross-section photos

Micrograph of the crimp barrel — the evidence most OEM quality teams ask for first.

FAIR / PPAP documentation

First-article inspection report, control plan and MSA(Measurement System Analysis) on request for programme launches.

02 — Warehouse

Material warehouse: the reason repeat orders start fast

Most cable-assembly and connector delays are not assembly delays — they are waiting for cable, terminals or a housing. We hold the parts that cause those waits, in a warehouse separated from finished goods, so a repeat order does not sit idle while material is on a truck.

Material warehouse aisle with cable drums and racks

Material warehouse — labels, heat-shrink, connectors and terminals

Cable and wire store with reels from 2.5 to 120 mm2

Cable and wire store — reels from 2.5 to 120 mm²

Finished goods warehouse with palletised cartons

Finished goods, packed for dispatch

Terminals & housings

Connector shells, terminals and seals stocked against active part numbers.

Cable & wire

Cut lengths and gauges held for repeat programmes, up to 120 mm².

Finished goods

Packed, labelled and kept in a separate zone, FIFO by location.

03 — Production

High-voltage and low-voltage harness and connector lines, under one roof

Ten assembly lines — seven for low-voltage connector and harness work, three for high-voltage — run under one roof. Cutting and crimping are automated; assembly, routing and taping are done by trained operators at fixed stations. Every harness passes an electrical test before packing — no sampling at the final gate.

STEP 01

Cutting

Automatic, ±1 mm

STEP 02

Stripping

Laser-checked length

STEP 03

Crimping

Height monitored

STEP 04

Pre-assembly

Housings, seals

STEP 05

Shielding

Braiding, taping

STEP 06

Assembly

Routing on board

STEP 07

E-test

100% continuity + HV

STEP 08

Packing

Label & trace code

High-voltage harness assembly in progress

Line A

HV harness and connector line

Battery, motor-phase, PDU, DCDC and air-compressor harnesses up to 120 mm² — shielded and unshielded, with ultrasonic splicing where the route needs it. HV connectors and MSDs are built alongside, with contact insertion, seal fitting and torque-controlled fastening.

Harness assembly line at Microtech Plus

Line B

LV harness and connector line

Seven lines for body, cabin, lighting and signal harnesses: automated cutting and crimping, hand routing on boards, taping and 100% continuity test. Low-voltage terminals and housings are crimped with height monitoring, then sealed and fastened to torque.

Equipment on the floor

04 — Automated equipment

Automation is about
consistency, not headcount

We cannot win on labour cost, and we do not try. We automate the operations where human variation causes failures — cutting length, stripping, crimp height — and keep people where judgement matters: routing, sealing, inspection.

01

Crimp height monitoring

Every crimp cycle is measured at the machine. Out-of-window parts are rejected there, not at final inspection.

02

100% electrical test

Continuity and HV withstand on every harness and cable set before packing. No AQL sampling at this gate.

03

Process data per batch

Crimp height and pull-force results are logged against the batch, so a drift shows up in the data before it shows up at the customer.

04

Traceability

Each carton carries a batch code linked to material lot, machine, operator and test record.

Automatic cutting, stripping and crimping machine

Automatic cut & crimp — Line A

05 — Quality inspection

Four gates between raw material and your dock

Under IATF 16949 the process is documented, not improvised. Each gate has a defined check, a defined record and a defined person who signs it off.

Gate 1

IQC

Incoming material

Cable conductor resistance and diameter, terminal plating and dimensions, housing material certificate. Rejected lots are quarantined with a red tag.

Gate 2

IPQC

In process

First-piece approval at every station change, then patrol checks on crimp height, pull-force and strip quality through the shift.

Gate 3

FQC

Final, 100% electrical

Continuity, point-to-point mapping and HV withstand on every piece, plus a visual check against the drawing.

Gate 4

OQC

Outgoing

AQL sampling per ISO 2859-1 before cartoning, packing and label verification, then batch code and trace record closed.

100% electrical test bench with operator

FQC electrical test — every piece, not a sample

Certifications

System: IATF 16949, ISO 9001. Product approvals: UL, TÜV, CE, CB, KC, PSE, CQC.

IATF 16949ISO 9001ULTÜVCEKCPSECQC

06 — Capacity

The numbers, so you can plan around us

Monthly output by family, minimum order quantities and standard lead times — published, not “ask sales”. A 200-piece connector order and a 20,000-piece harness run still do not share a line schedule, so the exact loading for your part is confirmed with your RFQ.

5,000

HV connectors

pcs per month

7,000

LV connectors

pcs per month

2,500–3,500

HV harnesses

sets per month

6,000–8,000

LV harnesses

sets per month

MOQ

Testing stage: 1–2 pcs from your drawing, before tooling or a purchase order. Small-batch production starts at 10 pcs.

Lead time

3–5 days for stocked or standard items; 3–4 weeks for made-to-order runs, counted from drawing approval and material readiness.

Repeat orders start from stock

Cable, terminals and housings are held for active programmes, so a re-run does not wait on a material lead time.

Air freight and DDP&DAP terms available. Ask for a capacity note with your RFQ — it lists line loading for your part numbers and the next free production slot.

Verify us yourself

Book a live video audit

30 minutes, camera in hand, walking the warehouse, the harness lines and the lab. You choose the route and the part numbers we pull. No editing, no stock footage.

Visit in person

No.38 Xinzhuang Avenue, Changshu,
Suzhou, Jiangsu, China

About an hour from Shanghai Hongqiao. Reception and meeting room on site for audits.

error: Content is protected !!

Welcome Contact With Us!

Thank you for your contact! Please just feel free to fill in below form.

And our sales engineer will get back to you ASAP. Or you can directly call us +86-18860235884

Power Module Connection

One step before the download

We ask for a business email and a company name so the follow-up is relevant. The PDF opens immediately.
Your data stays with our sales team. Read the privacy policy.
ESS Connection Solution

One step before the download

We ask for a business email and a company name so the follow-up is relevant. The PDF opens immediately.
Your data stays with our sales team. Read the privacy policy.
EV Connector Solution

One step before the download

We ask for a business email and a company name so the follow-up is relevant. The PDF opens immediately.
Your data stays with our sales team. Read the privacy policy.
EV Charging Solution

One step before the download

We ask for a business email and a company name so the follow-up is relevant. The PDF opens immediately.
Your data stays with our sales team. Read the privacy policy.
EV Harness Solution

One step before the download

We ask for a business email and a company name so the follow-up is relevant. The PDF opens immediately.
Your data stays with our sales team. Read the privacy policy.

Welcome to Contact Us Now

Please just feel free to contact us by filling in below form.

And our sales engineer will get back to you ASAP. Or you can call us at +86-18860235884