Energy storage system connection solutions
Connecting the modules that store the power

Four families cover the whole rack
MSD devices for safe service isolation of battery racks, with integrated high-voltage interlock(HVIL) options.
Why ESS integrators choose us
Complete model range
From 60A to 630A, from quick-plugs to service disconnectors — one supplier covers the whole ESS connection bill of materials(BOM).
From 60A to 500A in quick-plug
Competitive price
One partner consolidates connectors, cables and busbars for the whole rack, buys copper and plastics at scale and holds stock against your forecast — less paperwork, less freight, lower cost per rack.
Technical support
Current rating selection, wire cross-section advice, rack layout and creepage questions — answered by engineers who build the components.
Where ESS connection is heading
Higher voltage & higher current
Material and process upgrades
Liquid cooling for large systems
Busbars replacing harnesses
Custom ESS harnesses — and beyond
We also quote for
- Custom ESS rack wiring
- Busbar & laminated busbar builds
- Liquid-cooled connector projects
- Industrial automation wiring
- Robotics & rail connectors
- Other connector families on request
Questions buyers ask us
If yours is not here, send it with your drawing — a sales engineer answers within a few working hours.
Quick-plug connectors span 60A to 500A (10–150mm²), bolt connectors reach 250–600A, and manual service disconnectors cover 200–630A.
Yes — stacked connectors for home ESS in 60A and 100A ratings, with 3 power + 12 signal, 3 + 14, 5 + 12 and other pin configurations.
A Manual Service Disconnector lets technicians safely isolate a battery rack during maintenance. Most commercial ESS designs require one; we supply 200–630A types with interlock options.
Yes — custom lengths, wire cross-sections, connector combinations, labels and protective sleeving. Send a drawing or the rack layout and we quote within 2 working day.
Standard ESS connectors ship from stock, lead time 3-5 days; custom assemblies typically need 3–4 weeks for samples.




